Porirua Whaitua Collaborative Modelling Project
Search in document libraryThe sole purpose of this report and the associated services performed by Jacobs is to develop an integrated hydrological and contaminant model for the Te Awarua-o-Porirua (TAoP) catchment, in accordance with the scope of services set out in the contract between Jacobs and Greater Wellington Regional Council (GWRC). That scope of services, as described in this report, was developed with
GWRC.