The Ruamāhanga WIP was received in 2018. It has 119 recommendations of which 64 require non-regulatory implementation. Changes to the Natural Resources Plan to give effect to the 55 regulatory recommendations are still pending. Greater Wellington is currently examining the changes that could be made to advance these recommendations in the near term, against the backdrop of changing national direction. Due to the pending status of these recommendations, there is no update included in the reporting table.

There have been minor changes in the status of the non-regulatory recommendations in the Ruamāhanga Whaitua.