This technical note documents the validation of the Wellington Transport Strategy Model (WTSM) as part of the 2013 update of the model. The validation process ensures that the WTSM is…
This report is a technical assessment report to support an application to renew a groundwater take consent (resource consent: WGN160011 [33583]).
This technical note documents the validation of the Wellington Public Transport Model (WPTM) as part of the 2013 update of the model. The validation process ensures that the WPTM is…
This is the original resource consent application for WGN160011 [33583].
This paper looks at the value of pursuing flood protection options that are flexible, rather than adopting a single solution that cannot be adapted to deal with changing and unpredictable external…